Sunday 8 February 2009

Floor Panel Marking and Electrolysis

To prepare the Sierra donor parts I initially tried wire brushing by hand and by electric drill attachment. Seeing this woulded take a very long time I decided to try electrolysis and have set up a tub to do it in. Started the process on one of the front uprights.

Also today the chassis was upturned, floor panel clamped and chassis members marked onto it. Then the drill locations for the rivets were marked.

No comments:

Post a Comment